Hi everyone!
I’ve been having real issues sticking to the original project plan, so I’ve created a new one:
As you can see, it lists all of the things I’ve done, by when I’ve done them. I’m doing it like this, as it makes the whole project easier to keep track of. I’ll also be including the links to the relevant posts, so I can easily find everything once I’ve done it.
The major hassle I’ve been having with the original plan is that it’s too fixed and narrow; it cramps my creative style. I need at least some level of flexibility when working, otherwise if I hit a major setback, it’ll stymie my production. The new plan is nice and sectioned, making it easier to record and sort through the production. Each section is clearly labelled, simplifying navigation. I’m also including a section as to whether or not the particular piece has actually been used in the production.
This has been a major issue over the last couple of weeks, but hopefully, this should get things back on track.